
Industrial
Industrial Rooftop Package
Placeholder case study: rooftop package units for a process floor needing high ambient performance and service access.
Enquire about a similar projectSystems installed
Equipment placed on this site — placeholder list until real BOM lands.
Scope
The plant required cooling that could tolerate long shift loads and rooftop heat. We coordinated structural pads, crane lifts for outdoor packages, and duct drops into the production bay. Service walkways and isolation valves were planned into the first layout so filters and coils stay reachable. Placeholder narrative — replace with the real plant brief when available.
Specifications
- Category
- Industrial
- Location
- Sachin GIDC, Surat
- Area
- 18,000 sq ft (placeholder)
- System
- Rooftop package + fresh air














